Computers are terribly reliable, in general. Today’s computers execute millions of instructions each second, with an error rate that is inconceivable in other technologies. Yet, if you have hundreds of thousands of machines, you do need to take care of failures.

A Cnet article elaborates on the Google situation (a Google cluster has several thousands of machines):

In each cluster’s first year, it’s typical that 1,000 individual machine failures will occur; thousands of hard drive failures will occur; one power distribution unit will fail, bringing down 500 to 1,000 machines for about 6 hours; 20 racks will fail, each time causing 40 to 80 machines to vanish from the network; 5 racks will “go wonky,” with half their network packets missing in action; and the cluster will have to be rewired once, affecting 5 percent of the machines at any given moment over a 2-day span, Dean said. And there’s about a 50 percent chance that the cluster will overheat, taking down most of the servers in less than 5 minutes and taking 1 to 2 days to recover.

These look like interesting planning assumptions for both hardware and software planners. As they say:

“Our view is it’s better to have twice as much hardware that’s not as reliable than half as much that’s more reliable,” Dean said. “You have to provide reliability on a software level. If you’re running 10,000 machines, something is going to die every day.”